kerry downey
get a grip installation
2009
Installed in the farthest back corner of the gallery, the building's guts were exposed and explored using the service corridor, a utility closet, and defunct elevator shaft. spatial interruptions which were both subtle and overt including video, sculpture, found objects, and architectural elements

The videos explored two closets and a conference room also located on site.
PREV / NEXT   1 / 10
BACK TO GET A GRIP